Close X
Three-layer structure floor Construction plan, Unspecified beam top elevations are 11.110m., Indicates that the steel beam is hinged to the connected beam. The remaining unspecified beam-column and beam-to-beam connections are just connected.
TOTAL 3D CAD FILE
TOTAL ARCHITECTURE AND CIVIL ENGINEER TECHNOLOGY
TOTAL AUTOCAD BLOCKS
TOTAL ELECTRICAL CAD DRAWINGS
TOTAL INTERIORS DRAWINGS CAD FILES
TOTAL MACHINERY CAD DRAWING
TOTAL URBAN CAD DRAWINGS
TOTAL 3D MAX AND REVIT BLOCKS
TOTAL ARCHITECTURE CAD DRAWINGS
TOTAL CONSTRUCTIONS CAD DRAWINGS
TOTAL FURNITURES CAD DRAWINGS
TOTAL LANDSCAPINGS CAD DRAWINGS
TOTAL MISCELLANEOUS CAD FILES